
2500 Kg Max Load Pallet Rack Shelving Powder Coating For Third Party Distribution Centers
Description:
1. Pallet storage racking is the most economical storage system. However it is with less storage capacity compared with other storage systems.
2. In order to keep the pallet storage racking stable, the single row should be placed adjacent to the wall, and back-to-back row should be connected.
Profile of the Upright:
Name | Profile | Thickness |
Upright | 76*76 | 1.5 ~ 3.0mm |
85*67 | ||
90*70 | ||
100*67 | ||
100*95 | ||
120*95 |
Type and Profile of Beam:
Name | Profile | Name | Profile | Name | Profile | Name | Profile |
Boxed Beam | 80*50 | Step Beam | 3” | RHS or SHS Beam | 50*30 | Nosed Beam | 80*50 |
90*50 | 4” | 50*50 | 90*50 | ||||
100*50 | 4.5” | 60*40 | 100*50 | ||||
110*50 | 5” | 70*70 | 110*50 | ||||
120*50 | 5.5” | 80*40 | - | ||||
140*50 | 6” | 100*50 | 140*50 | ||||
160*50 | 6.25” | 100*100 | 160*50 |
Pallet Storage Racking:
Advantages:
- HUADE unique design for the normal racking system and automated storage systems
- Reliable raw material and electric components and more stable structure
- OEM Available: we are able to manufacture according to your design or ideas.
- Services: our responsibility is to provide the most reliable products with zero worry
- Delivery time: Reasonable procurement, production, quanlity control schedule ensure faster delivery time
- Besides theoretical calculation, realistic tests of the load capacities, failure tests have been done a lot to vertify the theoretical calculation.
Racking components can be assembled and disassemble quickly with on the detailed assembly drawing and simple instructions. For HUADE automated storage systems, we supply not only the systems, but also the electric control system and software WMS to optimize the space and enhance the management level in the warehouses.
Frequently Asked Questions
1. Q: Where is your factory located? How can I visit there?
A: Our factory is located in Nanjing of China, No.111, Hou Jiao
Road, Science Park, Jiangning District, Nanjing, China 211122.
We sincerely welcome you to visit our factory!
2. Q: What is the raw material of your products?
A: Q235B, other material is also available based on the
requirements.
3. Q: What is the term of payment?
A: 30% depoisit by T/T and balance upon receipt the copy of BL.
Nanjing Huade Storage Equipment Manufacturing Co.,Ltd
Nanjing HUADE Storage Equipment Manufacturing Co., Ltd was established in March, 1993. We are pioneered in rack manufacturing industry, and are one of the earliest professional manufacturer specializing in logistics storage systems, including warehouse planning, design, manufacturing and installing.
At present, we have a strong R & D team and professional manufacturing plants. In December 2009, a new factory with 66,000 square meters was built in Nanjing Jiangning Science Park. It indicates that HUADE has entered into a new stage of development. There are 5 professional manufacturing plants, more than 200 sets of equipments in the new factory. Annual production capacity is around 50,000 tons.
With partners from Japan and Europe, HUADE is dedicated in technical innovations, and actively improve and upgrade the products and technology to meet the international standards. HUADE has accomplished remarkable achievements on product optimization and automation, which favored by majority of customers in and abroad.
In 2012, HUADE designed and manufactured the first fully automated high-density storage carrier & shuttle system in China. As a pioneer of high-density storage automation, we concentrate on providing the optimal proposal on automated storage systems, realizing limited space expansion by unlimited storage automation.
We aim to offer a full range of services to the customers by our sales network all over the world.